From: Prepared by:
1、原材料信息/ Material Information
4、测量数据/Measured data
Bend half-and-half cut open
R38
Thickness Inspection Point
Thickness Inspection Point
检测数据依据图编号,依次对每批次炉号测量三只弯管,测量数据见表(弯管内侧壁厚需解剖后测量): Testing data according to the drawing number, each heat No. measuring three bends. Data shows in the table. (Inside thickness data needs cutting)
*厚度数据仅供参考/The thickness data is for reference only.
6、结论 Result
对成品尺寸按要求进行测量,符合标准要求。
Measured size is consistent with the standards requirement.
●
目录/Content{ TC \* MERGEFORMAT }
1、原材料信息/ Material Information . ......................................................................................................... 1 2、弯制过程/ The bending process . ........................................................................................................... 1 3、尺寸检测/Dimension Inspection . ........................................................................................................... 2 4、测量数据/Measured data ...................................................................................................................... 4 5、掰开后PT 检测/ PT test After opening the bends.................................................................................12 6、结论 Result . ........................................................................................................................................ 12
● 附件1 PT报告/Annex 1 PT report
● 附件2 热处理曲线/Annex 2 Heat treatment ● 附件3 硬度测试/Annex 3 Hardness test
From: Prepared by:
1、原材料信息/ Material Information
4、测量数据/Measured data
Bend half-and-half cut open
R38
Thickness Inspection Point
Thickness Inspection Point
检测数据依据图编号,依次对每批次炉号测量三只弯管,测量数据见表(弯管内侧壁厚需解剖后测量): Testing data according to the drawing number, each heat No. measuring three bends. Data shows in the table. (Inside thickness data needs cutting)
*厚度数据仅供参考/The thickness data is for reference only.
6、结论 Result
对成品尺寸按要求进行测量,符合标准要求。
Measured size is consistent with the standards requirement.
●
目录/Content{ TC \* MERGEFORMAT }
1、原材料信息/ Material Information . ......................................................................................................... 1 2、弯制过程/ The bending process . ........................................................................................................... 1 3、尺寸检测/Dimension Inspection . ........................................................................................................... 2 4、测量数据/Measured data ...................................................................................................................... 4 5、掰开后PT 检测/ PT test After opening the bends.................................................................................12 6、结论 Result . ........................................................................................................................................ 12
● 附件1 PT报告/Annex 1 PT report
● 附件2 热处理曲线/Annex 2 Heat treatment ● 附件3 硬度测试/Annex 3 Hardness test