竣工验收程序内容的分析

  摘  要:工程验收是在工程质量评定的基础上,依据一个既定的验收标准,采取一定的手段来检验工程产品的特性是否满足验收的标准的过程。在我国,传统的工程验收分为分部分项工程验收(包括隐蔽工程验收)、阶段(中间)验收、竣工验收。其中,阶段验收是指工程建设到某一关键阶段,如工程截流、水库蓄水之前,所进行的验收。竣工验收则是指工程已全部建成,并经一段时间的运行后所进行的验收。若竣工验收是指承包商按合同文件要求,基本完成了施工内容,质量符合要求,具备投产品和运用条件,可以正式办理工程移交前的工程验收。    关键词:竣工验收;程序内容   Completion and acceptance analysis of the contents of the program   Ai ni wa er・A bu du ke re mu   (Aksu Prefecture, Xinjiang the Awat County Water Conservancy Bureau, Aksu, Xinjiang 843000)    Abstract: The project acceptance on the basis of the assessment of the quality of the project, based on an established acceptance criteria, to take certain means test engineering product features meet the acceptance criteria. In China, the traditional engineering acceptance into sub-part of the project acceptance (including concealed work), stage (middle) acceptance, completion and acceptance. Among them, the stage of acceptance is the acceptance of construction projects to a critical stage, such as for closure of the reservoir storage. Completion and acceptance of the project had been completed, and after a period of operation of acceptance. If the completion and acceptance of the contractor under the contract documentation requirements, basically completed the construction content, quality to meet the requirements, have investment products and application conditions, prior to the transfer of formal engineering project acceptance.    Key words: final acceptance; program content    1.竣工验收的准备工作    在工程项目竣工验收之前,监理工程师应督促承包商做好下列竣工验收准备工作。    1.1完成收尾工程。收尾工程的特点是零星、分散、工程量小,但分布面广、某些收尾工程若不及时完成,将会直接影响项目的投产或交付使用。    1.2竣工验收资料准备。竣工验收资料和文件是工程项目竣工验收的重要依据,从施工开始应完整地积累和保管,竣工验收时应经编目建档。    1.3竣工验收前的预验收。承包商在竣工验收前的预验收,是初步鉴定工程质量,避免竣工进程拖延,保证项目顺利投产使用不可缺少的工作。通过预验,可及时发现遗留问题,事先予以返修补修。    2.竣工验收资料    (一)竣工验收的资料内容。主要有:    1)工程项目开工报告。    2)工程项目竣工报告、竣工图。    3)分部分项工程施工技术人员名单。    4)图纸会审和设计交底记录。工程变更通知单和核实单。    5)工程质量事故分析处理资料。    6)水平坐标、水准点和沉降位移等的测量记录。    7)材料、设备、构建的质量检测资料。    8)中间验收记录及相关资料。    9)试验、检验报告及有关质量评价资料。    10)施工大事记。    11)施工过程中发现的问题和处理意见。    (二)竣工验收资料的审核。监理工程师主要进行以下几方面的审核。    1)材料。设备、构件质量检验资料的审核。要求这方面的资料必须是如实反映情况,不得擅自修改、伪造和事后补作。    2)试验、检验及有关质量评价资料的审核。各种试验、检验资料要完整,分类进行整编。其他质量评价资料,如质量评定资料,要齐全。    3)中间验收(包括隐蔽工程)记录及施工记录审核。    4)竣工图审核。建设项目竣工图是真实地记录各种地下、地上建筑物等详细情况的技术文件,是对工程交工验收、维护、扩建、改建的依据,是工程使用单位长期保存的技术资料。监理工程师应对竣工图审核有足够的重视。    3.竣工验收的程序    现行水利水电工程验收的关规定,将工程的竣工验收分为初步验收和竣工验收两个步骤,这主要考虑到水利水电工程建设的复杂性,担心进行一次验收,对有些问题查不清,摸不透。因此,要求在竣工验收前进行一次技术性的初步验收。这样可以减少竣工验收时间,提高验收工作质量。对于一些建设内容单一、技术含量较低的水利工程项目,经竣工验收主持单位比准,可以不进行初步验收,而直接进行竣工验收。  当一个工程项目的所有单位工程完工后,应按前面介绍的程序时行单位工程完工验收或单位工程使用前验收。监理单位应根据施工单位自评资料和单位工程验收情况,组织对整个工程项目进行质量等级评定,项目法人在对整个工程项目的质量等级矛以确认后,将评定结果及其有关资料报质量监督部门核定,如果质量监督部门核定工程质量达到合格及其以上等级时,项目法人就可申请整个工程项目的竣工验收,在竣工验收前,竣工验收的主持单位一般要组织初查,或要求有关方面组织进行初步验收,如发现有问题还要进行处理,如认为符合要妥善处理,遗留问题处理完结以后,才能办理工程移交手续。

  摘  要:工程验收是在工程质量评定的基础上,依据一个既定的验收标准,采取一定的手段来检验工程产品的特性是否满足验收的标准的过程。在我国,传统的工程验收分为分部分项工程验收(包括隐蔽工程验收)、阶段(中间)验收、竣工验收。其中,阶段验收是指工程建设到某一关键阶段,如工程截流、水库蓄水之前,所进行的验收。竣工验收则是指工程已全部建成,并经一段时间的运行后所进行的验收。若竣工验收是指承包商按合同文件要求,基本完成了施工内容,质量符合要求,具备投产品和运用条件,可以正式办理工程移交前的工程验收。    关键词:竣工验收;程序内容   Completion and acceptance analysis of the contents of the program   Ai ni wa er・A bu du ke re mu   (Aksu Prefecture, Xinjiang the Awat County Water Conservancy Bureau, Aksu, Xinjiang 843000)    Abstract: The project acceptance on the basis of the assessment of the quality of the project, based on an established acceptance criteria, to take certain means test engineering product features meet the acceptance criteria. In China, the traditional engineering acceptance into sub-part of the project acceptance (including concealed work), stage (middle) acceptance, completion and acceptance. Among them, the stage of acceptance is the acceptance of construction projects to a critical stage, such as for closure of the reservoir storage. Completion and acceptance of the project had been completed, and after a period of operation of acceptance. If the completion and acceptance of the contractor under the contract documentation requirements, basically completed the construction content, quality to meet the requirements, have investment products and application conditions, prior to the transfer of formal engineering project acceptance.    Key words: final acceptance; program content    1.竣工验收的准备工作    在工程项目竣工验收之前,监理工程师应督促承包商做好下列竣工验收准备工作。    1.1完成收尾工程。收尾工程的特点是零星、分散、工程量小,但分布面广、某些收尾工程若不及时完成,将会直接影响项目的投产或交付使用。    1.2竣工验收资料准备。竣工验收资料和文件是工程项目竣工验收的重要依据,从施工开始应完整地积累和保管,竣工验收时应经编目建档。    1.3竣工验收前的预验收。承包商在竣工验收前的预验收,是初步鉴定工程质量,避免竣工进程拖延,保证项目顺利投产使用不可缺少的工作。通过预验,可及时发现遗留问题,事先予以返修补修。    2.竣工验收资料    (一)竣工验收的资料内容。主要有:    1)工程项目开工报告。    2)工程项目竣工报告、竣工图。    3)分部分项工程施工技术人员名单。    4)图纸会审和设计交底记录。工程变更通知单和核实单。    5)工程质量事故分析处理资料。    6)水平坐标、水准点和沉降位移等的测量记录。    7)材料、设备、构建的质量检测资料。    8)中间验收记录及相关资料。    9)试验、检验报告及有关质量评价资料。    10)施工大事记。    11)施工过程中发现的问题和处理意见。    (二)竣工验收资料的审核。监理工程师主要进行以下几方面的审核。    1)材料。设备、构件质量检验资料的审核。要求这方面的资料必须是如实反映情况,不得擅自修改、伪造和事后补作。    2)试验、检验及有关质量评价资料的审核。各种试验、检验资料要完整,分类进行整编。其他质量评价资料,如质量评定资料,要齐全。    3)中间验收(包括隐蔽工程)记录及施工记录审核。    4)竣工图审核。建设项目竣工图是真实地记录各种地下、地上建筑物等详细情况的技术文件,是对工程交工验收、维护、扩建、改建的依据,是工程使用单位长期保存的技术资料。监理工程师应对竣工图审核有足够的重视。    3.竣工验收的程序    现行水利水电工程验收的关规定,将工程的竣工验收分为初步验收和竣工验收两个步骤,这主要考虑到水利水电工程建设的复杂性,担心进行一次验收,对有些问题查不清,摸不透。因此,要求在竣工验收前进行一次技术性的初步验收。这样可以减少竣工验收时间,提高验收工作质量。对于一些建设内容单一、技术含量较低的水利工程项目,经竣工验收主持单位比准,可以不进行初步验收,而直接进行竣工验收。  当一个工程项目的所有单位工程完工后,应按前面介绍的程序时行单位工程完工验收或单位工程使用前验收。监理单位应根据施工单位自评资料和单位工程验收情况,组织对整个工程项目进行质量等级评定,项目法人在对整个工程项目的质量等级矛以确认后,将评定结果及其有关资料报质量监督部门核定,如果质量监督部门核定工程质量达到合格及其以上等级时,项目法人就可申请整个工程项目的竣工验收,在竣工验收前,竣工验收的主持单位一般要组织初查,或要求有关方面组织进行初步验收,如发现有问题还要进行处理,如认为符合要妥善处理,遗留问题处理完结以后,才能办理工程移交手续。


相关文章

  • 项目管理实施方案
  • 退城进园工程项目 项目管理实施方案 目 录 第一部分 项目管理综述 一.工程概况 二.我单位项目管理的优势 三.项目管理内容 四.项目组织管理体系 五.项目管理服务工作程序 第二部分 项目管理措施与制度 一.合同管理 二.项目设计管理 三. ...查看


  • 机电工程项目施工成本控制
  • 一.成本控制原则一般有以下几方面:政策性原则:效益性原则:开源与节流相结合的原则:全面性的原则:中间控制原则:责权利相结合原则:归口分级控制原则:专业控制和员工控制相结合原则:里外管理原则. 施工现场管理机构对项目成本进行全面.全过程的控制 ...查看


  • 一建机电实务详细目录2016版
  • 10000机电工程技术 11000机电工程项目常用材料及工程设备 11010机电工程项目常用材料 含金属材料,非金属材料和电工线材三大类. 11011机电工程项目常用金属材料的类型及应用 一.黑色金属材料的类型及应用 (一)碳素结构钢 (二 ...查看


  • 国家投资项目建设程序
  • 作者:     点 击 数:     更新时间: 2011-05-08 15:45    来源单位: 发展和改革局 国家投资项目建设程序 (一)根据国民经济和社会发展规划,结合行业和地区发展规划的要求,并按照目前国家的投资导向,以及当地经济 ...查看


  • 建设工程基本程序
  • 建设工程基本建设程序 我国工程基本建设主要程序主要有:投资决策时期.建设时期和交付使用时期,分以下几个阶段:项目建议书阶段,可行性研究报告阶段,设计文件(初步设计.施工图设计)阶段,建设准备阶段,建设实施阶段,投产试运阶段,竣工验收阶段,后 ...查看


  • 一级建造师管理质量总结
  • 第四章 建设工程项目质量控制(分值很高,25分左右) 第一节 质量管理与质量控制(2T ) 第一小节 对质量管理与质量控制的理解 一.质量和质量管理 1.质量概念:指一组固有特性满足要求的程度 固有特性包括:使用功能.寿命.安全可靠性.经济 ...查看


  • 国家投资基本建设程序
  • 国家投资基本建设程序 第一部分 基本概念 一.建设项目 一般是指在一个总体设计或初步设计范围内,由一个或若干个互相有内在联系的单项工程所组成,经济上实行统一核算,建设中统一管理的建设单位称为建设项目. 二.基本建设 凡固定资产扩大再生产的新 ...查看


  • 煤矿验收必要的手续和程序
  • 煤矿验收必要的手续和程序 一.合同工程(单个合同工程)的竣工验收,需在合同实体工程完工基础上进行,涉及到合同.工程实体.竣工资料和经济四大部分.涉及部门:由基建部组织,由合同.预算.财务和计划专业配合. 1.合同和经济部分的内容须具备: ① ...查看


  • 建设工程质量控制程序
  • 建设工程质量控制程序 为了确保燃气工程交付使用后的安全运行,加强对公司范围的燃气工程建设各阶段的质量控制,进一步明确工程建设中各方及我公司各职能部门的主要职责,规范建设工程质量控制的步骤和内容,特制定本程序. 一. 设计阶段工程质量控制程序 ...查看


热门内容