土地复垦方案编制规程(建设项目10-04-15)

ICS××.××

P××

备案号:J×××-××× 中华人民共和国国土资源行业标准

TD/T××××.6-2010

土地复垦方案编制规程—建设项目

Regulation on Compiling Land Reclamation Plan-Construction Projects

(征求意见稿)

××××-××-××发布 ××××-××-××实施

中华人民共和国国土资源部 发布

TD/T ××××.6-2010

目 次

1范 围 ............................................................................................................................................ 1

2规范性引用文件 .......................................................................................................................... 1

3基本术语和定义 .......................................................................................................................... 1

4总 则 ............................................................................................................................................ 1

5土地复垦方案编制程序 .............................................................................................................. 1

6土地复垦方案编制内容 .............................................................................................................. 1

6.1前 言 ......................................................................................................................................... 2

6.2编制总则 ................................................................................................................................... 2

6.3项目概况 ................................................................................................................................... 2

6.4土地复垦方向可行性分析 ....................................................................................................... 2

6.5土地复垦标准与措施 ............................................................................................................... 3

6.6土地复垦工程设计及工程量测算 ........................................................................................... 4

6.7土地复垦服务年限与工作计划安排 ....................................................................................... 4

6.8土地复垦投资估(概)算测算 ............................................................................................... 5

6.9土地复垦效益分析 ................................................................................. 错误!未定义书签。

6.10保障措施 ................................................................................................................................. 5

7 土地复垦方案编制成果 ............................................................................................................. 5

7.1报告 ........................................................................................................................................... 5

7.2附图 ........................................................................................................................................... 5

7.3附件 ........................................................................................................................................... 6

附录A(规范性附录)土地复垦适宜性评价方法与步骤 ......................................................... 7

I

前 言

为贯彻落实国务院《土地复垦条例》(2010)、国土资源部等七部委联合下发的《关于加强生产建设项目土地复垦管理工作的通知》(国土资发[2006]225号)和国土资源部下发的《关于组织土地复垦方案编报和审查有关问题的通知》(国土资发[2007]81号)的精神,进一步规范和指导土地复垦方案编制,促进土地复垦工作快速健康发展,特制定本规程。

TD/T××××《土地复垦方案编制规程》共分为七个部分:

——TD/T××××.1-2010 土地复垦方案编制规程—通则

——TD/T××××.2-2010 土地复垦方案编制规程—露天煤矿

——TD/T××××.3-2010 土地复垦方案编制规程—井工煤矿

——TD/T××××.4-2010 土地复垦方案编制规程—金属矿

——TD/T××××.5-2010 土地复垦方案编制规程—石油天然气(含煤层气)项目 ——TD/T××××.6-2010 土地复垦方案编制规程—建设项目

——TD/T××××.7-2010 土地复垦方案编制规程—铀矿山

本部分为TD/T××××.6-2010 土地复垦方案编制规程—建设项目部分。

本部分由国土资源部提出并负责解释。

本部分由国土资源部归口管理。

本部分主要起草单位:国土资源部耕地保护司、国土资源部土地整理中心、沈阳农业大学、中国地质大学(北京)、煤炭科学研究总院唐山研究院、北京矿冶研究总院、中国农业大学、中国核工业集团公司矿冶部。

本部分主要起草人:

本部分主要参加人员:

TD/T ××××.6-2010

土地复垦方案编制规程—建设项目

1范 围

TD/T××××的本部分规定了建设项目损毁土地复垦方案编制的一般原则、内容、方法和要求。

2规范性引用文件

参照TD/T××××.1-2010《土地复垦方案编制规程—通则》内容执行。

3基本术语和定义

除TD/T××××.1-2010《土地复垦方案编制规程—通则》部分涉及的术语外,下列术语和定义适用于本部分。

3.1建设项目

依法由国务院、省(自治区、直辖市)级人民政府批准建设用地的交通、水利、能源等项目。

3.2临时用地

建设项目在勘探和施工过程中临时使用的土地,包括施工便道、工业场地、办公生活区、临时表土堆放场和弃土场等。

3.3弃土场

项目建设过程中排弃剩余土壤和岩石的场地。

3.4取土场

因项目建设填方需要或复垦工程需要挖取土壤和岩石风化物的场地。

4总则

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》4.1-4.5内容执行。

5土地复垦方案编制程序

参照TD/T××××.1-2010《土地复垦方案编制规程—通则》5.1-5.4内容执行。

6土地复垦方案编制内容

建设项目土地复垦方案报告书应包含以下内容,具体编制格式参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》附录A;土地复垦方案报告表编

1

TD/T ××××.6-2010

制参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》附录B。

6.1前 言

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.1内容执行。

6.2编制总则

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.2内容执行。

6.3项目概况

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.3.1-6.3.4内容执行。 项目简介中应明确项目的名称、工程类型、项目位置、项目组成、投资规模、建设工期,列表说明项目用地构成和规模,并提供工程总体平面布置图。对于线性工程项目,如公路和输电线等工程,应按项目经过的地区分段(行政村)介绍。

6.4土地复垦方向可行性分析

6.4.1土地损毁分析与预测

6.4.1.1已损毁土地现状

给出项目区内已损毁土地的损毁类型、范围、面积及损毁程度等的调查和测算结果,并说明已损毁土地在工程建设工程中被重复损毁的可能性。

说明已损毁土地的复垦情况,包括复垦面积、范围、复垦方向及复垦效果等。附损毁土地及复垦情况的现场图片。

6.4.1.2土地损毁环节与时序

列表或图示说明项目建设过程中对土地损毁的形式、环节及时序。附项目的施工工艺流程图。

6.4.1.3拟损毁土地的预测

给出项目建设过程中因挖损、压占等损毁土地的范围、地类、面积和损毁程度等的预测结果。

6.4.1.4 复垦区与复垦责任范围确定

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.4.1.4内容执行。

6.4.2复垦区土地利用状况

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.4.2内容执行。

2

TD/T ××××.6-2010

6.4.3生态环境影响分析

给出项目主体建设工程和临时办公生活区、预制件场、沥青或混凝土拌和站、施工便道、料场、取土场和弃土(渣)场等对土地的损毁及施工过程给复垦区及其周围环境造成的影响,包括对水资源、土壤资源和生物资源的影响的分析内容。

6.4.4土地复垦适宜性评价

给出土地复垦适宜性评价依据、评价单元、评价方法、评价过程、评价结果,并列表说明各评价单元的复垦方向、面积和应采取的主要复垦措施。

土地复垦适宜性评价方法与步骤具体见附录A。

6.4.5复垦目标

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.4.5内容执行。

6.5 土地复垦标准与措施

6.5.1复垦标准

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.5.1内容执行。

应依据损毁前土地的质量状况,并结合当地实际,针对确定的各复垦单元制定相应的复垦标准。每一个复垦单元的复垦标准应包括岩土回填工程要达到的地形标准、土地的可供利用标准、生产力或生态恢复标准三部分内容。

对于同一个复垦方向,但是不属于同一个复垦单元的复垦土地,应按复垦单元分别列出相应的复垦标准。

6.5.2水土资源平衡分析

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.5.2内容执行。

6.5.3预防控制措施

应根据建设项目的工程设计及施工工艺等,针对不同的施工环节,说明建设过程中为减少土地损毁拟采取的合理预防与控制措施。

对于预防措施,应重点分析项目初步设计阶段拟定的临时工程选址及拟损毁土地类型和面积的合理性,并着重说明临时使用和损毁农用地,尤其是耕地的不可避让性,可以避让的,应提出用地选址调整方案。另外,还应着重指出可能导致土地污染的工程施工环节,并提出可行的污染控制措施。

3

TD/T ××××.6-2010

6.5.4复垦措施

6.5.4.1工程技术措施

给出损毁土地的表土剥离和保存措施,临时施工场地和办公生活区地上及地下构筑物和固化物的清理和处置措施。

说明不同复垦单元拟采用的各项土地复垦工程技术措施,包括覆土和土地平整工程、农田水利工程、道路工程、边坡稳定工程等。

6.5.4.2生物或化学措施

参照TD/T××××.1-2010《土地复垦方案编制规程—通则》6.5.2.2内容执行。

6.5.5复垦监测措施

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.5.3的要求执行。

6.5.6复垦管护措施

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.5.4的要求执行。

6.6土地复垦工程设计及工程量测算

6.6.1工程设计

复垦工程设计应以复垦单元为单位进行设计。

设计内容可根据项目类型、建设项目特点、地形地貌、区域气候特征等有所侧重。主要工程设计应附平面布置图、剖面图、典型工程图,并提供相关技术参数及文字说明。

工程设计内容应包括表土剥覆工程、土地平整工程、构筑物和固化物清理和处置工程、农田水利工程、道路工程、水土保持工程、监测和管护工程等的设计。

以挖损损毁方式为主的复垦单元的复垦工程设计应重点说明岩土回填工程的土方平衡情况及解决方案。

生物工程设计应包括植物种类筛选、苗木(种籽)规格、配置模式、密度(播种量)、整地规格等内容。

监测工程设计内容应包括监测点位的数量、位置及监测内容(土地损毁情况与土地复垦效果等)。

管护工程设计内容应包括管护对象、管护年限、管护次数及管护方法等。

6.6.2工程量测算

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.6.2内容执行。

6.7土地复垦服务年限与工作计划安排

4

TD/T ××××.6-2010

6.7.1 土地复垦服务年限

服务年限中应明确项目的建设工期,土地复垦方案的服务年限及确定依据。 应分别明确征收的没有被永久性建筑物和构筑物占用的被损毁土地和临时使用的损毁土地两部分的复垦服务年限。

对于没有被永久性建筑物和构筑物占用的建设用地的复垦年限应在项目竣工以前完成;对于临时使用土地复垦的服务年限原则上应该与土地使用期限一致,并在主体工程竣工之前完成。项目竣工之前不能完成的复垦任务要重点说明理由。另外,可依据复垦区的实际情况,规定一定期限的管护期。 6.7.2 土地复垦工作计划安排

提供复垦工作的阶段和区段划分方案,明确每一阶段、每一区段的复垦面积、复垦方向、工程量及投资额度等。

对建设期限限超过5年的生产项目,原则上应以每5年为一个复垦工作阶段。单独选址的线性工程建设项目应以村或乡(镇)为单位,并分区段说明土地复垦的目标、任务、计划和投资安排等。6.8土地复垦投资估(概)算测算

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.8内容执行。 6.9土地复垦效益分析

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.9内容执行。 6.10保障措施

参照TD/T××××.1-2010《土地复垦方案编制规程-通则》6.10.1-6.10.4内容执行。 7 土地复垦方案编制成果 7.1报告

(1)土地复垦方案报告书; (2)土地复垦方案报告表。 7.2附图

(1)项目区标准分幅土地利用现状图,并盖有相关地籍管理部门的公章; (2)损毁土地现状及预测分析图;

(3)土地复垦规划图(输电线和道路建设等多点或线性分布的项目,以村或乡(镇)为单位提供本图);

(4)建设项目位置图(比例尺应符合线性工程建设项目工程设计要求);

TD/T ××××.6-2010

(5)项目工程总体平面布置图。

附图应有图名、图例、线段比例尺、指北针、制图单位、制图人、制图时间。土地利用现状图、损毁预测图与复垦规划图的比例尺不小于1:10000,应注明图内的乡镇名、水系以及图件所用坐标系、高程基准等。 7.3附件

(1)土地复垦方案编制单位资质证书或业绩证明; (2)土地复垦义务人的土地复垦承诺书; (3)土地复垦方案编制委托函;

(4)已通过的项目的环境影响评价等报告的,应提供相应批复文件; (5)公众参与相关资料;

(6)项目区及复垦区照片及其它影像资料; (7)地方国土及相关部门意见; (8)其他

TD/T ××××.6-2010

附录A (资料性附录)

土地复垦适宜性评价方法与步骤

A.1评价原则和依据 A.1.1评价原则

损毁的农用地的适宜性评价和复垦方向的确定应遵循尽可能恢复原土地利用类型,且耕地数量不减少,质量不降低的原则。

对于不能恢复原土地利用类型和损毁的未利用土地的适宜性评价应在找出主导限制因素的前提下,按照因地制宜、农用地优先和符合当地土地利用规划的原则进行。 A.1.2评价依据

阐述评价的依据,主要包括国家及地方的规划和行业标准,以及土地损毁前的有关土地质量和相关工程质量参数。 A.2土地复垦适宜性评价流程

评价流程包括:确定评价范围,评价指标体系和标准的建立,划定评价单元,确定初步的复垦方向,评价方法和评价体系的选择,各评价单元的适宜性等级评定,确定各评价单元损毁土地的复垦方向,明确土地复垦单元,完成评价结果汇总表。 A.2.1评价范围

评价范围为方案服务年限内损毁的土地,包括已损毁和拟损毁土地两部分。 A.2.2评价单元的划分

根据土地损毁类型和损毁程度,以及损毁前的土地利用情况合理划分待复垦土地的损毁单元,并对各单元的损毁情况进行描述。对于具有点多、线长、面广、分散性的建设项目,在划分土地损毁单元的基础上还应以行政村为单位确定复垦工作区,并按下列表格的形式列出各单元的位置、原地类、损毁程度和面积等信息。

A.2.3复垦方向的初步确定

按照所遵循的评价原则和依据,在对各评价单元的适宜性进行初步分析的基础上,并在充分考虑评价单元损毁前土地利用类型的前提下,依据复垦区的自然概况、社会经济概况、相关规划和土地权利人意愿,初步确定复垦区各评价单元的复垦方向。 A.2.4评价方法选择

(1)参比法

建设项目土地复垦的对象包括项目建设过程中损毁的临时占地和项目征收部分损毁的非永久建设用地两部分。对于没有被永久建筑物和构筑物占用的征收土地的复垦方向原则上应该按照项目建设规划进行;对于损毁的临时占地的复垦,原则上应复垦为损毁前的土地利用类型,并确保土地质量不降低。土地损毁单元的复垦可行性分析应采用参比方法,即分别对各单元的土地损毁程度与该单元原土地的特征参数进行对比,分析该损毁单元复垦为原土地用途的可行性,并提出主要的复垦措施。

经被损毁,不能直接取得原地类的土地特征参数,可以用与该土地相邻的同用途土地的特征参数,并取得土地承包人和所有人的认可。农用地的土地特征参数主要包括表C.2中所列的信息。除表中的参数外,根据土地的具体用途可以增加能够反映土地特征及其生产力和生态环境状况的参数,如产量、覆盖度、郁闭度、土壤酸碱度、土壤含盐量、排灌状况等。

涉及损毁道路的,按照原道路情况和所属道路级别制定参比标准。

通过对照表A.2的中的各项参比标准,对表A.1中各损毁单元复垦为原地类(用途)的可行性进行分析。分析应该包括清除地表覆盖物、固化物、污染物的可行性;在工程上进行地形重塑的可行性;客土质量和数量是否有保证(不可用保证率表示);对于耕地,还应分析重建和恢复农田基础设施的可行性;土壤改良的可行性,以及资金保障情况。

TD/T ××××.6-2010

在进行复垦方向的可行性分析时应充分征求土地权属人和当地政府的意见;道路和其他公共基础用地的复垦还应符合当地土地利用规划和城镇建设规划;对于损毁的未利用土地的复垦方向的确定,应遵循“因地制宜,优先用于农用地的原则”。应将项目主体工程永久性建设占地的表土进行剥离、储存,并用于土地的复垦或土壤改良。

应结合复垦区土壤现状、复垦措施等进行表土剥离量和需求量的供需平衡分析。在土源不足情况下,要落实客土来源,并给出客土场的位置、客土方案、客土质量、客土熟化或培肥措施、以及客土场的复垦和生态恢复措施;复垦工程中涉及灌溉工程的,需进行水资源平衡分析。

(2)其他评价方法

对于不能恢复原土地利用类型和损毁的未利用土地的适宜性评价应在找出主导限制因素的前提下,按照因地制宜、农用地优先和符合当地土地利用规划的原则进行。评价方法参照TD/T××××.1-2010《土地复垦方案编制规程—通则》附录C中的C.2.3- C.2.5部分执行。

A.3确定最终复垦方向和划分复垦单元 A.3.1确定最终复垦方向

依据适宜性评价结果,同一评价单元可能存在多宜性,需综合分析复垦土地自然条件、社会条件、工程施工难易程度等情况,并通过土地复垦类比分析,遵循评价原则,确定最终的土地复垦方向。 A.3.2划分复垦单元

为了便于工程设计、施工和监督管理,在确定各损毁单元复垦方向的基础上,对复垦方向相同,主要复垦工程和技术措施一致的损毁单元进行归类,确定损毁土地的复垦单元。

列表说明损毁土地的适宜性评价结果。土地复垦单元划分结果应在规划图上标出,并应做到图表对应。

ICS××.××

P××

备案号:J×××-××× 中华人民共和国国土资源行业标准

TD/T××××.6-2010

土地复垦方案编制规程—建设项目

Regulation on Compiling Land Reclamation Plan-Construction Projects

(征求意见稿)

××××-××-××发布 ××××-××-××实施

中华人民共和国国土资源部 发布

TD/T ××××.6-2010

目 次

1范 围 ............................................................................................................................................ 1

2规范性引用文件 .......................................................................................................................... 1

3基本术语和定义 .......................................................................................................................... 1

4总 则 ............................................................................................................................................ 1

5土地复垦方案编制程序 .............................................................................................................. 1

6土地复垦方案编制内容 .............................................................................................................. 1

6.1前 言 ......................................................................................................................................... 2

6.2编制总则 ................................................................................................................................... 2

6.3项目概况 ................................................................................................................................... 2

6.4土地复垦方向可行性分析 ....................................................................................................... 2

6.5土地复垦标准与措施 ............................................................................................................... 3

6.6土地复垦工程设计及工程量测算 ........................................................................................... 4

6.7土地复垦服务年限与工作计划安排 ....................................................................................... 4

6.8土地复垦投资估(概)算测算 ............................................................................................... 5

6.9土地复垦效益分析 ................................................................................. 错误!未定义书签。

6.10保障措施 ................................................................................................................................. 5

7 土地复垦方案编制成果 ............................................................................................................. 5

7.1报告 ........................................................................................................................................... 5

7.2附图 ........................................................................................................................................... 5

7.3附件 ........................................................................................................................................... 6

附录A(规范性附录)土地复垦适宜性评价方法与步骤 ......................................................... 7

I

前 言

为贯彻落实国务院《土地复垦条例》(2010)、国土资源部等七部委联合下发的《关于加强生产建设项目土地复垦管理工作的通知》(国土资发[2006]225号)和国土资源部下发的《关于组织土地复垦方案编报和审查有关问题的通知》(国土资发[2007]81号)的精神,进一步规范和指导土地复垦方案编制,促进土地复垦工作快速健康发展,特制定本规程。

TD/T××××《土地复垦方案编制规程》共分为七个部分:

——TD/T××××.1-2010 土地复垦方案编制规程—通则

——TD/T××××.2-2010 土地复垦方案编制规程—露天煤矿

——TD/T××××.3-2010 土地复垦方案编制规程—井工煤矿

——TD/T××××.4-2010 土地复垦方案编制规程—金属矿

——TD/T××××.5-2010 土地复垦方案编制规程—石油天然气(含煤层气)项目 ——TD/T××××.6-2010 土地复垦方案编制规程—建设项目

——TD/T××××.7-2010 土地复垦方案编制规程—铀矿山

本部分为TD/T××××.6-2010 土地复垦方案编制规程—建设项目部分。

本部分由国土资源部提出并负责解释。

本部分由国土资源部归口管理。

本部分主要起草单位:国土资源部耕地保护司、国土资源部土地整理中心、沈阳农业大学、中国地质大学(北京)、煤炭科学研究总院唐山研究院、北京矿冶研究总院、中国农业大学、中国核工业集团公司矿冶部。

本部分主要起草人:

本部分主要参加人员:

TD/T ××××.6-2010

土地复垦方案编制规程—建设项目

1范 围

TD/T××××的本部分规定了建设项目损毁土地复垦方案编制的一般原则、内容、方法和要求。

2规范性引用文件

参照TD/T××××.1-2010《土地复垦方案编制规程—通则》内容执行。

3基本术语和定义

除TD/T××××.1-2010《土地复垦方案编制规程—通则》部分涉及的术语外,下列术语和定义适用于本部分。

3.1建设项目

依法由国务院、省(自治区、直辖市)级人民政府批准建设用地的交通、水利、能源等项目。

3.2临时用地

建设项目在勘探和施工过程中临时使用的土地,包括施工便道、工业场地、办公生活区、临时表土堆放场和弃土场等。

3.3弃土场

项目建设过程中排弃剩余土壤和岩石的场地。

3.4取土场

因项目建设填方需要或复垦工程需要挖取土壤和岩石风化物的场地。

4总则

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》4.1-4.5内容执行。

5土地复垦方案编制程序

参照TD/T××××.1-2010《土地复垦方案编制规程—通则》5.1-5.4内容执行。

6土地复垦方案编制内容

建设项目土地复垦方案报告书应包含以下内容,具体编制格式参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》附录A;土地复垦方案报告表编

1

TD/T ××××.6-2010

制参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》附录B。

6.1前 言

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.1内容执行。

6.2编制总则

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.2内容执行。

6.3项目概况

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.3.1-6.3.4内容执行。 项目简介中应明确项目的名称、工程类型、项目位置、项目组成、投资规模、建设工期,列表说明项目用地构成和规模,并提供工程总体平面布置图。对于线性工程项目,如公路和输电线等工程,应按项目经过的地区分段(行政村)介绍。

6.4土地复垦方向可行性分析

6.4.1土地损毁分析与预测

6.4.1.1已损毁土地现状

给出项目区内已损毁土地的损毁类型、范围、面积及损毁程度等的调查和测算结果,并说明已损毁土地在工程建设工程中被重复损毁的可能性。

说明已损毁土地的复垦情况,包括复垦面积、范围、复垦方向及复垦效果等。附损毁土地及复垦情况的现场图片。

6.4.1.2土地损毁环节与时序

列表或图示说明项目建设过程中对土地损毁的形式、环节及时序。附项目的施工工艺流程图。

6.4.1.3拟损毁土地的预测

给出项目建设过程中因挖损、压占等损毁土地的范围、地类、面积和损毁程度等的预测结果。

6.4.1.4 复垦区与复垦责任范围确定

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.4.1.4内容执行。

6.4.2复垦区土地利用状况

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.4.2内容执行。

2

TD/T ××××.6-2010

6.4.3生态环境影响分析

给出项目主体建设工程和临时办公生活区、预制件场、沥青或混凝土拌和站、施工便道、料场、取土场和弃土(渣)场等对土地的损毁及施工过程给复垦区及其周围环境造成的影响,包括对水资源、土壤资源和生物资源的影响的分析内容。

6.4.4土地复垦适宜性评价

给出土地复垦适宜性评价依据、评价单元、评价方法、评价过程、评价结果,并列表说明各评价单元的复垦方向、面积和应采取的主要复垦措施。

土地复垦适宜性评价方法与步骤具体见附录A。

6.4.5复垦目标

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.4.5内容执行。

6.5 土地复垦标准与措施

6.5.1复垦标准

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.5.1内容执行。

应依据损毁前土地的质量状况,并结合当地实际,针对确定的各复垦单元制定相应的复垦标准。每一个复垦单元的复垦标准应包括岩土回填工程要达到的地形标准、土地的可供利用标准、生产力或生态恢复标准三部分内容。

对于同一个复垦方向,但是不属于同一个复垦单元的复垦土地,应按复垦单元分别列出相应的复垦标准。

6.5.2水土资源平衡分析

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.5.2内容执行。

6.5.3预防控制措施

应根据建设项目的工程设计及施工工艺等,针对不同的施工环节,说明建设过程中为减少土地损毁拟采取的合理预防与控制措施。

对于预防措施,应重点分析项目初步设计阶段拟定的临时工程选址及拟损毁土地类型和面积的合理性,并着重说明临时使用和损毁农用地,尤其是耕地的不可避让性,可以避让的,应提出用地选址调整方案。另外,还应着重指出可能导致土地污染的工程施工环节,并提出可行的污染控制措施。

3

TD/T ××××.6-2010

6.5.4复垦措施

6.5.4.1工程技术措施

给出损毁土地的表土剥离和保存措施,临时施工场地和办公生活区地上及地下构筑物和固化物的清理和处置措施。

说明不同复垦单元拟采用的各项土地复垦工程技术措施,包括覆土和土地平整工程、农田水利工程、道路工程、边坡稳定工程等。

6.5.4.2生物或化学措施

参照TD/T××××.1-2010《土地复垦方案编制规程—通则》6.5.2.2内容执行。

6.5.5复垦监测措施

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.5.3的要求执行。

6.5.6复垦管护措施

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.5.4的要求执行。

6.6土地复垦工程设计及工程量测算

6.6.1工程设计

复垦工程设计应以复垦单元为单位进行设计。

设计内容可根据项目类型、建设项目特点、地形地貌、区域气候特征等有所侧重。主要工程设计应附平面布置图、剖面图、典型工程图,并提供相关技术参数及文字说明。

工程设计内容应包括表土剥覆工程、土地平整工程、构筑物和固化物清理和处置工程、农田水利工程、道路工程、水土保持工程、监测和管护工程等的设计。

以挖损损毁方式为主的复垦单元的复垦工程设计应重点说明岩土回填工程的土方平衡情况及解决方案。

生物工程设计应包括植物种类筛选、苗木(种籽)规格、配置模式、密度(播种量)、整地规格等内容。

监测工程设计内容应包括监测点位的数量、位置及监测内容(土地损毁情况与土地复垦效果等)。

管护工程设计内容应包括管护对象、管护年限、管护次数及管护方法等。

6.6.2工程量测算

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.6.2内容执行。

6.7土地复垦服务年限与工作计划安排

4

TD/T ××××.6-2010

6.7.1 土地复垦服务年限

服务年限中应明确项目的建设工期,土地复垦方案的服务年限及确定依据。 应分别明确征收的没有被永久性建筑物和构筑物占用的被损毁土地和临时使用的损毁土地两部分的复垦服务年限。

对于没有被永久性建筑物和构筑物占用的建设用地的复垦年限应在项目竣工以前完成;对于临时使用土地复垦的服务年限原则上应该与土地使用期限一致,并在主体工程竣工之前完成。项目竣工之前不能完成的复垦任务要重点说明理由。另外,可依据复垦区的实际情况,规定一定期限的管护期。 6.7.2 土地复垦工作计划安排

提供复垦工作的阶段和区段划分方案,明确每一阶段、每一区段的复垦面积、复垦方向、工程量及投资额度等。

对建设期限限超过5年的生产项目,原则上应以每5年为一个复垦工作阶段。单独选址的线性工程建设项目应以村或乡(镇)为单位,并分区段说明土地复垦的目标、任务、计划和投资安排等。6.8土地复垦投资估(概)算测算

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.8内容执行。 6.9土地复垦效益分析

参照TD/T××××.1-2010 《土地复垦方案编制规程—通则》6.9内容执行。 6.10保障措施

参照TD/T××××.1-2010《土地复垦方案编制规程-通则》6.10.1-6.10.4内容执行。 7 土地复垦方案编制成果 7.1报告

(1)土地复垦方案报告书; (2)土地复垦方案报告表。 7.2附图

(1)项目区标准分幅土地利用现状图,并盖有相关地籍管理部门的公章; (2)损毁土地现状及预测分析图;

(3)土地复垦规划图(输电线和道路建设等多点或线性分布的项目,以村或乡(镇)为单位提供本图);

(4)建设项目位置图(比例尺应符合线性工程建设项目工程设计要求);

TD/T ××××.6-2010

(5)项目工程总体平面布置图。

附图应有图名、图例、线段比例尺、指北针、制图单位、制图人、制图时间。土地利用现状图、损毁预测图与复垦规划图的比例尺不小于1:10000,应注明图内的乡镇名、水系以及图件所用坐标系、高程基准等。 7.3附件

(1)土地复垦方案编制单位资质证书或业绩证明; (2)土地复垦义务人的土地复垦承诺书; (3)土地复垦方案编制委托函;

(4)已通过的项目的环境影响评价等报告的,应提供相应批复文件; (5)公众参与相关资料;

(6)项目区及复垦区照片及其它影像资料; (7)地方国土及相关部门意见; (8)其他

TD/T ××××.6-2010

附录A (资料性附录)

土地复垦适宜性评价方法与步骤

A.1评价原则和依据 A.1.1评价原则

损毁的农用地的适宜性评价和复垦方向的确定应遵循尽可能恢复原土地利用类型,且耕地数量不减少,质量不降低的原则。

对于不能恢复原土地利用类型和损毁的未利用土地的适宜性评价应在找出主导限制因素的前提下,按照因地制宜、农用地优先和符合当地土地利用规划的原则进行。 A.1.2评价依据

阐述评价的依据,主要包括国家及地方的规划和行业标准,以及土地损毁前的有关土地质量和相关工程质量参数。 A.2土地复垦适宜性评价流程

评价流程包括:确定评价范围,评价指标体系和标准的建立,划定评价单元,确定初步的复垦方向,评价方法和评价体系的选择,各评价单元的适宜性等级评定,确定各评价单元损毁土地的复垦方向,明确土地复垦单元,完成评价结果汇总表。 A.2.1评价范围

评价范围为方案服务年限内损毁的土地,包括已损毁和拟损毁土地两部分。 A.2.2评价单元的划分

根据土地损毁类型和损毁程度,以及损毁前的土地利用情况合理划分待复垦土地的损毁单元,并对各单元的损毁情况进行描述。对于具有点多、线长、面广、分散性的建设项目,在划分土地损毁单元的基础上还应以行政村为单位确定复垦工作区,并按下列表格的形式列出各单元的位置、原地类、损毁程度和面积等信息。

A.2.3复垦方向的初步确定

按照所遵循的评价原则和依据,在对各评价单元的适宜性进行初步分析的基础上,并在充分考虑评价单元损毁前土地利用类型的前提下,依据复垦区的自然概况、社会经济概况、相关规划和土地权利人意愿,初步确定复垦区各评价单元的复垦方向。 A.2.4评价方法选择

(1)参比法

建设项目土地复垦的对象包括项目建设过程中损毁的临时占地和项目征收部分损毁的非永久建设用地两部分。对于没有被永久建筑物和构筑物占用的征收土地的复垦方向原则上应该按照项目建设规划进行;对于损毁的临时占地的复垦,原则上应复垦为损毁前的土地利用类型,并确保土地质量不降低。土地损毁单元的复垦可行性分析应采用参比方法,即分别对各单元的土地损毁程度与该单元原土地的特征参数进行对比,分析该损毁单元复垦为原土地用途的可行性,并提出主要的复垦措施。

经被损毁,不能直接取得原地类的土地特征参数,可以用与该土地相邻的同用途土地的特征参数,并取得土地承包人和所有人的认可。农用地的土地特征参数主要包括表C.2中所列的信息。除表中的参数外,根据土地的具体用途可以增加能够反映土地特征及其生产力和生态环境状况的参数,如产量、覆盖度、郁闭度、土壤酸碱度、土壤含盐量、排灌状况等。

涉及损毁道路的,按照原道路情况和所属道路级别制定参比标准。

通过对照表A.2的中的各项参比标准,对表A.1中各损毁单元复垦为原地类(用途)的可行性进行分析。分析应该包括清除地表覆盖物、固化物、污染物的可行性;在工程上进行地形重塑的可行性;客土质量和数量是否有保证(不可用保证率表示);对于耕地,还应分析重建和恢复农田基础设施的可行性;土壤改良的可行性,以及资金保障情况。

TD/T ××××.6-2010

在进行复垦方向的可行性分析时应充分征求土地权属人和当地政府的意见;道路和其他公共基础用地的复垦还应符合当地土地利用规划和城镇建设规划;对于损毁的未利用土地的复垦方向的确定,应遵循“因地制宜,优先用于农用地的原则”。应将项目主体工程永久性建设占地的表土进行剥离、储存,并用于土地的复垦或土壤改良。

应结合复垦区土壤现状、复垦措施等进行表土剥离量和需求量的供需平衡分析。在土源不足情况下,要落实客土来源,并给出客土场的位置、客土方案、客土质量、客土熟化或培肥措施、以及客土场的复垦和生态恢复措施;复垦工程中涉及灌溉工程的,需进行水资源平衡分析。

(2)其他评价方法

对于不能恢复原土地利用类型和损毁的未利用土地的适宜性评价应在找出主导限制因素的前提下,按照因地制宜、农用地优先和符合当地土地利用规划的原则进行。评价方法参照TD/T××××.1-2010《土地复垦方案编制规程—通则》附录C中的C.2.3- C.2.5部分执行。

A.3确定最终复垦方向和划分复垦单元 A.3.1确定最终复垦方向

依据适宜性评价结果,同一评价单元可能存在多宜性,需综合分析复垦土地自然条件、社会条件、工程施工难易程度等情况,并通过土地复垦类比分析,遵循评价原则,确定最终的土地复垦方向。 A.3.2划分复垦单元

为了便于工程设计、施工和监督管理,在确定各损毁单元复垦方向的基础上,对复垦方向相同,主要复垦工程和技术措施一致的损毁单元进行归类,确定损毁土地的复垦单元。

列表说明损毁土地的适宜性评价结果。土地复垦单元划分结果应在规划图上标出,并应做到图表对应。


相关文章

  • 土地复垦方案编制规程(金属矿10-04-20)
  • ICS××.×× P×× 备案号:J×××-××× TD 土地复垦方案编制规程-金属矿 Regulation on Compiling Land Reclamation Plan-Metal Mine (征求意见稿) ××××-××-××发 ...查看


  • 土地整治规划专题研究技术方案
  • XXX 市土地整治规划专题研究 技术方案 XXX 省国土资源勘测规划院 二〇一一年五月 XXX 市上轮土地开发整理规划 实施情况评价研究技术方案 根据国土资源部关于开展市.地级土地整治规划的统一安排和XXX 省国土资源厅的工作部署,编制XX ...查看


  • 乡级土地利用总体规划编制规程报批稿(最终稿)
  • ICS TD TD/T XXXX -2010 中华人民共和国土地管理行业标准 乡(镇)土地利用总体规划编制规程 Guideline for Formulating the Town-level General Land Use Plan ( ...查看


  • 土地复垦方案相关格式及装订要求
  • 附件1. 土地复垦方案报告资料相关格式及装订要求 ×××项目 土地复垦方案报告书 (一号黑体字) 项目单位:××(小三号黑体字)(公章) 编制单位:××(小三号黑体字)(公章) ××年××月××日(小三号黑体字) 土地复垦方案报告封面格式 ...查看


  • 乡级土地利用总体规划编制规程
  • ICS 备案号: TD 乡(镇)土地利用总体规划编制规程 Guideline for the town-level general land use planning 中华人民共和国国土资源部 发布 目 次 前 言 ............ ...查看


  • 贵州省县级土地利用规划指导意见
  • 贵州省县级土地利用规划指导意见 贵州省县(市.区)级土地利用 总体规划编制指导意见 (讨论稿) 县(市.区)级土地利用总体规划编制指导意见是在国土资源部尚未出台土地利用总体规划编制技术规程的前提下,为推进和规范贵州省县(市.区)土地利用总体 ...查看


  • 土地整治规划招标文件
  • 项目名称:****市土地整治规划编制项目 招标文件 ****市土地整治规划编制项目 ****市国土资源局 #年#月#日 目 录 第一章 招标公告 ............................................... ...查看


  • 土地整理导言
  • 前言: 同学们,你们好!新学期即将开始,你们一定很想了解<土地整理与复垦>是怎样一门课,它的教学目标和基本任务是什么,能学到哪些知识,如何学好这些知识,有那些可利用的网络辅导资源.下面就这些问题给大家做一概述. 国土资源是人类赖 ...查看


  • 土地复垦条例实施办法
  • 土地复垦条例实施办法 (2012年12月11日国土资源部第4次部务会议审议通过) 第一章 总 则 ....................................................................... ...查看


热门内容