建筑项目管理的方式方法总结

工程项目内部控制,是指企业为提高建设资金使用效益,防范工程项目各个环节的差错与舞弊,提高工程质量,结合企业工程的特点和管理的要求而制定的内部控制制度与程序等。

Project internal control "refers to the enterprise in order to improve the efficient use of construction funds, to prevent project each link errors and fraud, improve the quality of engineering, combine the characteristics of enterprise engineering and management requirements of the internal control system and procedures, etc.

工程项目,尤其是重大工程项目往往体现企业发展战略和中长期发展规划,对于提高企业再生产能力和支撑保障能力、促进企业可持续发展具有关键作用。同时,工程项目一般工期相对较长、投资数额较大,专业技术要求较高,如不加强管理和控制,往往容易发生舞弊行为。事实上,由于工程项目投入资源多、占用资金大、建设工期长、涉及环节多、多种利益关系错综复杂,已经构成了经济犯罪和腐败问题的“高危区”。现代工程项目规模越来越大,技术越来越复杂,风险同样也在增大。因此,工程项目内部控制日益为项目管理人员所重视。为了保证工程项目顺利进行,实现工程项目规范管理目标,提高单位资金使用效益,防范决策失误及防止舞弊行为,有效杜绝工程项目的盲目建设、工程招投标程序不规范、工程超预算、或任意扩大范围、提高标准、工程预决算高估冒算、擅自挪用、拆借、转移项目资金等问题的发生,加强工程项目的内部控制具有重要意义和作用。

Engineering projects, especially the important engineering projects tend to reflect enterprise development strategies and mid-term and long-term development planning, to improve enterprise reproduction ability and support ability, promote enterprise sustainable development is crucial. At the same time, the project is generally relatively long construction period and investment amount is larger, professional technology demand is higher, if not strengthen management and control, often prone to fraud. In fact, due to project resources, take up more money, long construction period and various related links, intricate relations in interests, already constitute the economic crime and corruption "high-risk area". Modern engineering project scale is more and more big, the technology is more and more complex, the risk also increases. Therefore, the project internal control is becoming more and more attention by project managers. To ensure project smoothly, realize the goal of project management, improve unit fund use efficiency, prevent decision-making errors and prevent fraud, effectively eliminate blind construction of the project, project bidding procedure is not standard, engineering budget, or arbitrary expansion range, raising standards, engineering budget overestimate risk calculation, arbitrarily use, borrow, transfer project funding problems, strengthen the internal control of the project is of great significance and role.

一、工程项目内部控制设计

The internal control design and project

工程项目内部控制设计是对工程项目实施有效内部控制的首要步骤,是工程项目内部控制实施、评价和审计的基础。

Project internal control design is the first step of project implement effective internal control, internal control is the project implementation, evaluation and audit.

工程项目内部控制设计需要企业根据国家内部控制基本规范及配套指引等的要求,结合企业生产经营的实际需要,建立和完善工程项目各项管理制度,全面梳理各个环节可能存在的风险点,规范工程立项、招标、造价、建设、验收等环节的工作流程,明确相关部门和岗位的职责权限,做到可行性研究与决策、概预算编制与审核、项目实施与价款支付、竣工决算与审计等不相容职务相互分离,强化工程建设全过程的监控,确保工程项目的质量、进度和资金安全。

Project internal control design need to enterprise internal control basic according to the national standards and supporting guidance etc, combining the actual requirement of enterprise production and business operation, establish and perfect the project management system, comprehensive combing each link risk points, construction project, bidding, cost, specifications and acceptance of work flow, clear the responsibility and authority of the relevant departments and posts, do the feasibility study and decision, budget preparation and review, project implementation and the price payment, completion final accounts and audit mutual separation of incompatible duties, strengthen the whole construction process of monitoring, to ensure the safety of the engineering project quality, progress and capital.

一般而言,工程项目内部控制设计包括以下内容:

In general, the project design of internal control includes the following content:

(一) 描述现状

(a) describe the status quo

描述现状,就是梳理工程项目方面的内部管理制度或相关文件,梳理工程项目现状业务流程,编制工程项目内部管理制度或相关文件情况表、资金工程项目业务流程目录、绘制工程项目业务流程图等工程项目内部控制设计的基础性工作。这是工程项目内部控制设计实施阶段的首要环节。不论企业大小,因为工程项目的重要性,都会有些工程项目管理制度或文件,内部控制设计者必须认真梳理。在梳理工程项目管理制度和业务流程现状的基础上,设计者根据内部控制设计的要求,编制工程项目业务流程目录,绘制工程项目业务流程图。

Describes the status quo, is combing project aspects of the internal management system or related documents, comb project status of business process, prepare the project internal management system or related file table, capital project business process directory , draw project business process diagrams such as project basic work of the internal control design. This is the first step of project internal control design in the implementation stage. Regardless of business size, because of the importance of the project, are some project or file management system, internal control designers must carefully combed. In combing the present situation of engineering project management system and business process, based on the designer according to the requirement of the internal control design, preparation of project business process directory, draw project business process diagrams.

本阶段设计工作成果是编制《工程项目内部管理制度或相关文件情况表》、《工程项目流程目录》、《工程项目业务流程图》。

This phase of design work is compiling the project situation table "internal management system or related documents, the catalog of the project process, project business process diagrams.

企业工程项目业务到底包括哪些,这因工程项目内容的不同而不同。工程项目涵盖的内容较多,包括新建、改建、扩建、迁建、恢复工程及与之相联系的其他经济活动。总体上来说,工程项目按其实施过程一般可以分为决策阶段、设计阶段、实施阶段、竣工阶段和项目后评价阶段。《11号应用指引》将工程项目业务流程界定为企业工程立项、工程招标、工程造价、工程建设、工程验收等活动。我国企业在工程项目内部控制设计时,应将工程项目业务范畴统一到指引的要求上来。当然,企业工程项目复杂多样,工程项目内部管理制度、业务流程千差万别,因此,本阶段的设计在总体上体现指引要求的基础上,在具体的业务流程的设计上一定要体现不同企业工程项目的自身特点,不能简单照抄照搬。依据“中天恒3C 框架”理论,企业工程项目业务流程应包括以下基本控制环节:

What are the, business enterprise project that differ with different content of the project. Projects covers the content of more, including newly built, renovated or expanded, the relocation, the restoration project and other economic activity associated with it. In general, according to the project implementation process in general can be divided into decision-making stage, design stage, implementation stage and completion stage and after the project evaluation stage. "The application guide of 11" defines the project business process for the enterprise engineering project, project bidding, project cost, project construction, project acceptance and other activities. Our country enterprise internal control of the project design, project business category should be unified to guide requirements. Enterprise project is complicated, of course, the internal management system of engineering project, the business processes differ in thousands ways, therefore, this phase of the design in general, on the basis of meet the requirement of guidance, on the design of the specific business process must reflect the characteristics of different enterprise project, can't simply copy. Based on the theory of "zhongtian hang 3 c framework", enterprise business process project should include the following basic control links:

(1)工程项目决策。工程项目决策过程分为项目建议书、可行性研究、项目决策三个阶段,建设单位应在这三个阶段建立相应的内部控制。

(1) the project decision-making. Project decision-making process is divided into three project proposal, feasibility study, project decision-making stage, the construction units should set up the corresponding internal control in the three stages.

(2)勘察设计。建设单位应当建立相应勘察设计单位选择程序和标准,择优选取具有相应资质的勘查设计单位,并签订设计合同。重大工程项目应采用招投标方式选取设计单位。严禁建设单位委托无证或不具备相应资质的单位承担工程设计。

(2) the survey and design. The construction unit shall set up a corresponding survey and design unit selection procedures and standards, preferential selection has the corresponding qualification

of prospecting design unit, and signed the design contract. Major project bidding mode selecting design unit should be adopted. Absolutely stop the construction of units without a license or do not have the corresponding qualifications entrusted by the unit to undertake engineering design.

(3)概预算控制。建设单位应当建立合理的概预算程序与制度,实现对工程项目造价的控制。概预算编制口径的确定应当考虑固定资产核算的要求。

(3) budget control. Construction units should set up a reasonable budget program and system to realize the project cost control. Determine the budget establishment caliber should consider fixed assets accounting requirements.

(4)招投标。建设单位应当根据招标项目的特点和需要自行或委托相关机构编制招标文件,明确招标项目的技术要求、对投标人资格审查的标准、投标报价要求和评标标准等所有实质性要求和条件以及拟签订合同的主要条款。招标文件中关于审查投标人资格的财务标准和投标报价要求等内容须经过建设单位会计机构或人员的认可。

(4) the bidding. The construction unit shall, according to the characteristics and needs of a project subject to tender on its own or entrust relevant institutions preparing his tender documents and specific technical requirements for the project subject to tender, the qualification standard of bidders, bidding quotation and bid assessment standards all substantive requirements and conditions, and the principal clauses of contract. Financial standards about review qualified bidders in the tender documents and tender offer requirements, etc must be approved by the construction unit accounting agencies or personnel.

(5)合同控制。建设单位应当依据《合同法》的规定,分别与勘察设计单位、监理单位、施工单位及材料设备供应商订立书面合同,明确当事人各方的权利和义务。

(5) control of the contract. The construction unit shall be based on "contract law" regulation, respectively, and the survey and design unit, supervision unit and construction unit equipment and materials suppliers to conclude a contract in writing, clearly the rights and obligations of the parties concerned.

(6)施工过程控制。施工过程控制包括工程质量施工合同的执行、施工款项的拨付、工程质量、投资、进度控制、施工费用管理等内容,建设单位应依据项目自身的特点及管理要求建立相宜的内部会计控制制度。

(6) the construction process control. Construction process control including the engineering quality and the appropriation of the execution of construction contract, construction funds, construction quality, progress, investment control, construction cost management, etc, the construction unit should be based on the characteristics of the project itself and the community management requirements to establish internal accounting control system.

(7)竣工验收。建设单位会计机构或人员在工程竣工后,应及时开展各项清理工作。主要包括各类会计资料的归集整理、账务处理、财产物资的盘点核实及债权债务的清偿,做到账账、

账证、账实、账表相符。

(7) the completion acceptance. Construction unit accounting agencies or personnel in the project is completed, should be timely action to clean up. Mainly include all kinds of finishing the account of the accounting information, accounting treatment, assets are the inventory verification and liquidation of creditor's rights debt, accomplish ZhangZhang, zhang, zhang, zhang table is consistent.

(8)监督检查。建设单位应当建立对工程项目业务的监督检查制度,明确监督检查机构或人员的职责权限,定期和不定期地进行检查。

(8) supervision and inspection. The construction unit shall establish a system of supervision and inspection of project business, clear the responsibility and authority of the supervision and inspection agencies or personnel, and regularly inspect aperiodically.

工程项目内部控制,是指企业为提高建设资金使用效益,防范工程项目各个环节的差错与舞弊,提高工程质量,结合企业工程的特点和管理的要求而制定的内部控制制度与程序等。

Project internal control "refers to the enterprise in order to improve the efficient use of construction funds, to prevent project each link errors and fraud, improve the quality of engineering, combine the characteristics of enterprise engineering and management requirements of the internal control system and procedures, etc.

工程项目,尤其是重大工程项目往往体现企业发展战略和中长期发展规划,对于提高企业再生产能力和支撑保障能力、促进企业可持续发展具有关键作用。同时,工程项目一般工期相对较长、投资数额较大,专业技术要求较高,如不加强管理和控制,往往容易发生舞弊行为。事实上,由于工程项目投入资源多、占用资金大、建设工期长、涉及环节多、多种利益关系错综复杂,已经构成了经济犯罪和腐败问题的“高危区”。现代工程项目规模越来越大,技术越来越复杂,风险同样也在增大。因此,工程项目内部控制日益为项目管理人员所重视。为了保证工程项目顺利进行,实现工程项目规范管理目标,提高单位资金使用效益,防范决策失误及防止舞弊行为,有效杜绝工程项目的盲目建设、工程招投标程序不规范、工程超预算、或任意扩大范围、提高标准、工程预决算高估冒算、擅自挪用、拆借、转移项目资金等问题的发生,加强工程项目的内部控制具有重要意义和作用。

Engineering projects, especially the important engineering projects tend to reflect enterprise development strategies and mid-term and long-term development planning, to improve enterprise reproduction ability and support ability, promote enterprise sustainable development is crucial. At the same time, the project is generally relatively long construction period and investment amount is larger, professional technology demand is higher, if not strengthen management and control, often prone to fraud. In fact, due to project resources, take up more money, long construction period and various related links, intricate relations in interests, already constitute the economic crime and corruption "high-risk area". Modern engineering project scale is more and more big, the technology is more and more complex, the risk also increases. Therefore, the project internal control is becoming more and more attention by project managers. To ensure project smoothly, realize the goal of project management, improve unit fund use efficiency, prevent decision-making errors and prevent fraud, effectively eliminate blind construction of the project, project bidding procedure is not standard, engineering budget, or arbitrary expansion range, raising standards, engineering budget overestimate risk calculation, arbitrarily use, borrow, transfer project funding problems, strengthen the internal control of the project is of great significance and role.

一、工程项目内部控制设计

The internal control design and project

工程项目内部控制设计是对工程项目实施有效内部控制的首要步骤,是工程项目内部控制实施、评价和审计的基础。

Project internal control design is the first step of project implement effective internal control, internal control is the project implementation, evaluation and audit.

工程项目内部控制设计需要企业根据国家内部控制基本规范及配套指引等的要求,结合企业生产经营的实际需要,建立和完善工程项目各项管理制度,全面梳理各个环节可能存在的风险点,规范工程立项、招标、造价、建设、验收等环节的工作流程,明确相关部门和岗位的职责权限,做到可行性研究与决策、概预算编制与审核、项目实施与价款支付、竣工决算与审计等不相容职务相互分离,强化工程建设全过程的监控,确保工程项目的质量、进度和资金安全。

Project internal control design need to enterprise internal control basic according to the national standards and supporting guidance etc, combining the actual requirement of enterprise production and business operation, establish and perfect the project management system, comprehensive combing each link risk points, construction project, bidding, cost, specifications and acceptance of work flow, clear the responsibility and authority of the relevant departments and posts, do the feasibility study and decision, budget preparation and review, project implementation and the price payment, completion final accounts and audit mutual separation of incompatible duties, strengthen the whole construction process of monitoring, to ensure the safety of the engineering project quality, progress and capital.

一般而言,工程项目内部控制设计包括以下内容:

In general, the project design of internal control includes the following content:

(一) 描述现状

(a) describe the status quo

描述现状,就是梳理工程项目方面的内部管理制度或相关文件,梳理工程项目现状业务流程,编制工程项目内部管理制度或相关文件情况表、资金工程项目业务流程目录、绘制工程项目业务流程图等工程项目内部控制设计的基础性工作。这是工程项目内部控制设计实施阶段的首要环节。不论企业大小,因为工程项目的重要性,都会有些工程项目管理制度或文件,内部控制设计者必须认真梳理。在梳理工程项目管理制度和业务流程现状的基础上,设计者根据内部控制设计的要求,编制工程项目业务流程目录,绘制工程项目业务流程图。

Describes the status quo, is combing project aspects of the internal management system or related documents, comb project status of business process, prepare the project internal management system or related file table, capital project business process directory , draw project business process diagrams such as project basic work of the internal control design. This is the first step of project internal control design in the implementation stage. Regardless of business size, because of the importance of the project, are some project or file management system, internal control designers must carefully combed. In combing the present situation of engineering project management system and business process, based on the designer according to the requirement of the internal control design, preparation of project business process directory, draw project business process diagrams.

本阶段设计工作成果是编制《工程项目内部管理制度或相关文件情况表》、《工程项目流程目录》、《工程项目业务流程图》。

This phase of design work is compiling the project situation table "internal management system or related documents, the catalog of the project process, project business process diagrams.

企业工程项目业务到底包括哪些,这因工程项目内容的不同而不同。工程项目涵盖的内容较多,包括新建、改建、扩建、迁建、恢复工程及与之相联系的其他经济活动。总体上来说,工程项目按其实施过程一般可以分为决策阶段、设计阶段、实施阶段、竣工阶段和项目后评价阶段。《11号应用指引》将工程项目业务流程界定为企业工程立项、工程招标、工程造价、工程建设、工程验收等活动。我国企业在工程项目内部控制设计时,应将工程项目业务范畴统一到指引的要求上来。当然,企业工程项目复杂多样,工程项目内部管理制度、业务流程千差万别,因此,本阶段的设计在总体上体现指引要求的基础上,在具体的业务流程的设计上一定要体现不同企业工程项目的自身特点,不能简单照抄照搬。依据“中天恒3C 框架”理论,企业工程项目业务流程应包括以下基本控制环节:

What are the, business enterprise project that differ with different content of the project. Projects covers the content of more, including newly built, renovated or expanded, the relocation, the restoration project and other economic activity associated with it. In general, according to the project implementation process in general can be divided into decision-making stage, design stage, implementation stage and completion stage and after the project evaluation stage. "The application guide of 11" defines the project business process for the enterprise engineering project, project bidding, project cost, project construction, project acceptance and other activities. Our country enterprise internal control of the project design, project business category should be unified to guide requirements. Enterprise project is complicated, of course, the internal management system of engineering project, the business processes differ in thousands ways, therefore, this phase of the design in general, on the basis of meet the requirement of guidance, on the design of the specific business process must reflect the characteristics of different enterprise project, can't simply copy. Based on the theory of "zhongtian hang 3 c framework", enterprise business process project should include the following basic control links:

(1)工程项目决策。工程项目决策过程分为项目建议书、可行性研究、项目决策三个阶段,建设单位应在这三个阶段建立相应的内部控制。

(1) the project decision-making. Project decision-making process is divided into three project proposal, feasibility study, project decision-making stage, the construction units should set up the corresponding internal control in the three stages.

(2)勘察设计。建设单位应当建立相应勘察设计单位选择程序和标准,择优选取具有相应资质的勘查设计单位,并签订设计合同。重大工程项目应采用招投标方式选取设计单位。严禁建设单位委托无证或不具备相应资质的单位承担工程设计。

(2) the survey and design. The construction unit shall set up a corresponding survey and design unit selection procedures and standards, preferential selection has the corresponding qualification

of prospecting design unit, and signed the design contract. Major project bidding mode selecting design unit should be adopted. Absolutely stop the construction of units without a license or do not have the corresponding qualifications entrusted by the unit to undertake engineering design.

(3)概预算控制。建设单位应当建立合理的概预算程序与制度,实现对工程项目造价的控制。概预算编制口径的确定应当考虑固定资产核算的要求。

(3) budget control. Construction units should set up a reasonable budget program and system to realize the project cost control. Determine the budget establishment caliber should consider fixed assets accounting requirements.

(4)招投标。建设单位应当根据招标项目的特点和需要自行或委托相关机构编制招标文件,明确招标项目的技术要求、对投标人资格审查的标准、投标报价要求和评标标准等所有实质性要求和条件以及拟签订合同的主要条款。招标文件中关于审查投标人资格的财务标准和投标报价要求等内容须经过建设单位会计机构或人员的认可。

(4) the bidding. The construction unit shall, according to the characteristics and needs of a project subject to tender on its own or entrust relevant institutions preparing his tender documents and specific technical requirements for the project subject to tender, the qualification standard of bidders, bidding quotation and bid assessment standards all substantive requirements and conditions, and the principal clauses of contract. Financial standards about review qualified bidders in the tender documents and tender offer requirements, etc must be approved by the construction unit accounting agencies or personnel.

(5)合同控制。建设单位应当依据《合同法》的规定,分别与勘察设计单位、监理单位、施工单位及材料设备供应商订立书面合同,明确当事人各方的权利和义务。

(5) control of the contract. The construction unit shall be based on "contract law" regulation, respectively, and the survey and design unit, supervision unit and construction unit equipment and materials suppliers to conclude a contract in writing, clearly the rights and obligations of the parties concerned.

(6)施工过程控制。施工过程控制包括工程质量施工合同的执行、施工款项的拨付、工程质量、投资、进度控制、施工费用管理等内容,建设单位应依据项目自身的特点及管理要求建立相宜的内部会计控制制度。

(6) the construction process control. Construction process control including the engineering quality and the appropriation of the execution of construction contract, construction funds, construction quality, progress, investment control, construction cost management, etc, the construction unit should be based on the characteristics of the project itself and the community management requirements to establish internal accounting control system.

(7)竣工验收。建设单位会计机构或人员在工程竣工后,应及时开展各项清理工作。主要包括各类会计资料的归集整理、账务处理、财产物资的盘点核实及债权债务的清偿,做到账账、

账证、账实、账表相符。

(7) the completion acceptance. Construction unit accounting agencies or personnel in the project is completed, should be timely action to clean up. Mainly include all kinds of finishing the account of the accounting information, accounting treatment, assets are the inventory verification and liquidation of creditor's rights debt, accomplish ZhangZhang, zhang, zhang, zhang table is consistent.

(8)监督检查。建设单位应当建立对工程项目业务的监督检查制度,明确监督检查机构或人员的职责权限,定期和不定期地进行检查。

(8) supervision and inspection. The construction unit shall establish a system of supervision and inspection of project business, clear the responsibility and authority of the supervision and inspection agencies or personnel, and regularly inspect aperiodically.


相关文章

  • 实习总结:2017年10月大学生生产实习总结
  • 一.实习目的和要求 生产实习是理论联系实际,全面贯彻党的教育方针,培养德智体全面发展的人才的一项重要措施,是教学计划中重要的教学环节. 1.实习目的 (1)通过实习,对-般工业与民用建筑施工前的准备工作和整个施工过程有较深刻的了解; (2) ...查看


  • 施工组织实训总结(32)
  • 建筑施工组织实训总结 姓 名:张诗艺 指导教师:肖凯成 班 级:建工0913 学 号:2009633124 一.单位施工工程概况总结 为期一周的建筑施工组织实训即将拉下帷幕,在这一周内有所付出,当然也有所收获. 单位工程施工组织设计的编制程 ...查看


  • 暖通设计入门知识速成方法
  • 暖通设计入门知识速成学习方法 就暖通设计专业而言,当前职场上具备实际技能的暖通设计人员,非常紧缺!而且暖通专业应用广泛,需求量特别大,尤其那些具备实际设计技能的人更是难得!上海磨石建筑培训学校(www.ms2010.com 4006-600 ...查看


  • 建筑工程造价预结算审核管理方式分析
  • [摘要]我国经济的发展带动了城市化进程的加快,建筑行业也获得了飞速的发展.建筑工程的管理工作也引起人们的关注,合理的开展工程预结算的审核管理工作,可以使有限的资金投入,发挥出最大的作用,取得最大的效果.本文对我国建筑工程造价预结算审核管理方 ...查看


  • 建筑施工成本管理毕业论文
  • 浅析我国建筑企业工程管理信息化难成功的问题 我国建筑业工程项目管理信息技术的开发应用从最初的工程预算与进度计划管理开始发展到现在走过了20多年的历程,存在两个明显的问题:一是我国的工程项目管理信息系统应用效果普遍不理想,二是我国至今尚未形成 ...查看


  • 设计院实习总结
  • 设计院实习总结 一.实习目的: 通过设计院的实习,了解建筑师的基本工作程序.工作方法.职业素质要求,毕业后能更好适应市场的发展和社会的要求,同时,也是检验学生在校的学习下的成果,弥补课堂学习之不足,提高综合设计的技能,以达到专业培养的目标. ...查看


  • 建筑企业管理学课程设计
  • 河北科技师范学院 课程设计报告 课程名称: 设计题目: 建筑企业文化建设 院 系: 城市建设学院 专业班级: 工管接本1105班 组 号: 第十二组 起止日期: 2012年6月18日2012年6月21日 指导教师: 徐淑媛 组员分工:组长: ...查看


  • 招投标总结
  • 招投标与合同管理 时间:11周周五(11月18日):上午第二大节10点 地点: 13工程3-4:西配203.考试时间:90分钟 填空题:20×1=20分.名词解释:4×3=12分.单选:10×2=20分 简答题:3×6=18分.案例分析题: ...查看


  • 民用建筑施工过程中的安全管理
  • 本科生毕业论文(设计) 题 目: 民用建筑施工过程中的安全管理 专业代码: 作者姓名: 学 号: 单 位: 指导教师: 目 录 前 言 . .................................................. ...查看


  • 变形监测技术与应用-课程总结
  • <变形监测技术与应用> ------课程总结 测绘BG092 周涛 30 1.变形监测的内容.目的与意义 1.1变形监测的内容 变形监测的内容,要根据变形体的性质与地基情况来定.要有针对性,既要有重点,又考虑全面考虑,以便能正确 ...查看


热门内容