The following method is used for calculation of MTBF (Mean Time Between Failure) based on field failures for ACS 400. Only complete inverter module returns are considered in the calculation. The same method can be used for essentially all products where field failures can be measure by quantity and in time.

1. Basic Formulas.

The most common and simplest way of looking at reliability is to assume that an exponential

distribution applies. The reliability (R) or proportion of drives that remains functional after a specific time (t) can then be expressed as:

R =e

This formula can be rewritten as:

-t MTBF MTBF =-1 ln R

MTBF can now be calculated when reliability (R) is known. Reliability in this case is just a number that expresses how many units that are functional after a period of time. For example, if we are looking at 1000 drives for 1 year and find that 50 of the drives failed during the year, R = (1000 – 50)/1000 = 0.95. MTBF can be calculated to be 19.5 years using the formula above. The reason why the unit of

measure becomes years in this case is that we looked at the drives for 1 year. If the period of time had been ½ year, MTBF would be 19.5 ½ years = 9.75 years.

Note that the crude method of just dividing the number of drives looked at (1000) with the number of failures (50), yields a similar result (20 years). The difference is in that using the exponential

distribution takes into account the fact that the number of drives left in operation declines during the year.

2. Specific method used by New Berlin

When MTBF is to be calculated, the period of time during which failures are counted must be

determined. One major factor in selecting a time period is that failure rate has seasonal variations due to ambient temperature variations and variations in loading. For New Berlin this effectively means that the time during which failures are counted must be a multiple of 1 year. A 1 year period of time was chosen because if time is longer, the waiting period before an MTBF value can be calculated becomes too long.

Another consideration is what batch of drives to use for each MTBF calculation. In New Berlin we choose the drives produced in each month since the amount of drives is sufficiently large (approx. 3000) to produce a reasonable amount of failures during a year. The amount of failures affects the error in the MTBF calculation (see below) and it should therefore be chosen accordingly.

The third decision to make is when to start the year during which failures are counted. A dwell time after the production month is obviously necessary because it takes time for the drives to get into operation. In addition, the initial start up of drives and the initial period in operation is likely to have a higher failure rate (infant mortality) and an MTBF value should not include these extraordinary events. :///.doc

Confidential for Internal Use Only Print Date: 03/28/13 4:08 AM

In New Berlin we chose a dwell time of 9 months. This decision was based on a study of how drive failures occurred in relation to the production date. The study was performed for ACS 400 drives produced in each month from July, 2000 through June, 2001 (see attached spreadsheet

failtime400.xls). The age of drives at failure were recorded and grouped into 1 month slots. The chart in the spreadsheet, which shows the density function for drive failures, indicates that some sort of stability is reached after 9 months.

As an example of timing, let’s consider drives produced in January, 2000. Failure recording would start on 9/1/00 and continue through 8/31/01. Obviously the waiting time to be able to calculate the MTBF for a particular month is 1 year and 9 month.

There are some additional corrections that should be considered in the calculation of MTBF. First is the fact that drives fail before we enter the 1 year measuring period. These failures are in no way involved in the MTBF calculation but they reduce the quantity of drives participating in the 1 year run. Therefore a correction needs to be made to the initial quantity of drives. From spreadsheet failtime.xls it can be calculated that the quantity of drives failing in the 0 – 9 month time frame is approx. 0.85 times the drives that fail during the 1 year run. Therefore, the initial quantity is assumed to be Qp – 0.85 * Qf , where Qp is the quantity of drives produced and Qf is the quantity of drives failed in the 1 year run. With this in mind the final formula for MTBF becomes:

MTBF =-1 ⎛Q p -1. 85⋅Q f ⎫⎪ln Q -0. 85⋅Q ⎪f ⎭⎝p

The 9 month dwell time and the 12 month failure recording time means that currently the last month for which MTBF can be calculated is July, 2001. A way to get preliminary values for a few more months is to use a shorter failure recording period and estimate the correction needed to get to the full 12 month period. Spreadsheet failtime.xls gives an indication about suitable correction factors (last column). The accuracy of MTBF values obtained in this way is of course less than when a full 12 month period is used.

The calculated MTBF values for ACS 400 in the US are attached as an Excel spreadsheet

(MTBF400.xls).

3. Errors in MTBF

Although the MTBF is calculated on the entire population of drives from a production month and all failures are recorded during the 12 month recording period, there is a statistical error associated with the MTBF calculation. The error is a result of the fact that failures occur at random and the recording period is limited in time. In this case where the failures are counted during a predetermined period, the data is considered time-censored (type 1) and the lower and upper 90 % confidence limits becomes:

:///.doc

Confidential for Internal Use Only MTBF l =MTBF ⋅χ20. 05, 2⋅Q 2⋅Q f f +2 Print Date: 03/28/13 4:08 AM

MTBF u =MTBF ⋅χ20. 95, 2⋅Q f 2⋅Q f

Where Qf is the number of drives failed and MTBF is the value calculated per section 2 above. The chi-squared function is readily available in Excel as CHIINV(probability, deg. of freedom)

The error is very helpful in determining if fluctuations seen in MTBF are just noise or a real change in the quality of the drives. With the chosen 90 % confidence a good fit trend line should fall within the confidence limits 90 % of the time. If it doesn’t there is a high probability that there are real problems. An example of that is our own MTBF trend (attached below). For the spring of 2001 there are many data points that fall to the side of the trend line. We don’t know for sure what happened back then but it was the time when manufacture of the main boards was shifted from Flextronics in Sweden to Flextronics in Finland.

:///.doc

Confidential for Internal Use Only Print Date: 03/28/13 4:08 AM

The following method is used for calculation of MTBF (Mean Time Between Failure) based on field failures for ACS 400. Only complete inverter module returns are considered in the calculation. The same method can be used for essentially all products where field failures can be measure by quantity and in time.

1. Basic Formulas.

The most common and simplest way of looking at reliability is to assume that an exponential

distribution applies. The reliability (R) or proportion of drives that remains functional after a specific time (t) can then be expressed as:

R =e

This formula can be rewritten as:

-t MTBF MTBF =-1 ln R

MTBF can now be calculated when reliability (R) is known. Reliability in this case is just a number that expresses how many units that are functional after a period of time. For example, if we are looking at 1000 drives for 1 year and find that 50 of the drives failed during the year, R = (1000 – 50)/1000 = 0.95. MTBF can be calculated to be 19.5 years using the formula above. The reason why the unit of

measure becomes years in this case is that we looked at the drives for 1 year. If the period of time had been ½ year, MTBF would be 19.5 ½ years = 9.75 years.

Note that the crude method of just dividing the number of drives looked at (1000) with the number of failures (50), yields a similar result (20 years). The difference is in that using the exponential

distribution takes into account the fact that the number of drives left in operation declines during the year.

2. Specific method used by New Berlin

When MTBF is to be calculated, the period of time during which failures are counted must be

determined. One major factor in selecting a time period is that failure rate has seasonal variations due to ambient temperature variations and variations in loading. For New Berlin this effectively means that the time during which failures are counted must be a multiple of 1 year. A 1 year period of time was chosen because if time is longer, the waiting period before an MTBF value can be calculated becomes too long.

Another consideration is what batch of drives to use for each MTBF calculation. In New Berlin we choose the drives produced in each month since the amount of drives is sufficiently large (approx. 3000) to produce a reasonable amount of failures during a year. The amount of failures affects the error in the MTBF calculation (see below) and it should therefore be chosen accordingly.

The third decision to make is when to start the year during which failures are counted. A dwell time after the production month is obviously necessary because it takes time for the drives to get into operation. In addition, the initial start up of drives and the initial period in operation is likely to have a higher failure rate (infant mortality) and an MTBF value should not include these extraordinary events. :///.doc

Confidential for Internal Use Only Print Date: 03/28/13 4:08 AM

In New Berlin we chose a dwell time of 9 months. This decision was based on a study of how drive failures occurred in relation to the production date. The study was performed for ACS 400 drives produced in each month from July, 2000 through June, 2001 (see attached spreadsheet

failtime400.xls). The age of drives at failure were recorded and grouped into 1 month slots. The chart in the spreadsheet, which shows the density function for drive failures, indicates that some sort of stability is reached after 9 months.

As an example of timing, let’s consider drives produced in January, 2000. Failure recording would start on 9/1/00 and continue through 8/31/01. Obviously the waiting time to be able to calculate the MTBF for a particular month is 1 year and 9 month.

There are some additional corrections that should be considered in the calculation of MTBF. First is the fact that drives fail before we enter the 1 year measuring period. These failures are in no way involved in the MTBF calculation but they reduce the quantity of drives participating in the 1 year run. Therefore a correction needs to be made to the initial quantity of drives. From spreadsheet failtime.xls it can be calculated that the quantity of drives failing in the 0 – 9 month time frame is approx. 0.85 times the drives that fail during the 1 year run. Therefore, the initial quantity is assumed to be Qp – 0.85 * Qf , where Qp is the quantity of drives produced and Qf is the quantity of drives failed in the 1 year run. With this in mind the final formula for MTBF becomes:

MTBF =-1 ⎛Q p -1. 85⋅Q f ⎫⎪ln Q -0. 85⋅Q ⎪f ⎭⎝p

The 9 month dwell time and the 12 month failure recording time means that currently the last month for which MTBF can be calculated is July, 2001. A way to get preliminary values for a few more months is to use a shorter failure recording period and estimate the correction needed to get to the full 12 month period. Spreadsheet failtime.xls gives an indication about suitable correction factors (last column). The accuracy of MTBF values obtained in this way is of course less than when a full 12 month period is used.

The calculated MTBF values for ACS 400 in the US are attached as an Excel spreadsheet

(MTBF400.xls).

3. Errors in MTBF

Although the MTBF is calculated on the entire population of drives from a production month and all failures are recorded during the 12 month recording period, there is a statistical error associated with the MTBF calculation. The error is a result of the fact that failures occur at random and the recording period is limited in time. In this case where the failures are counted during a predetermined period, the data is considered time-censored (type 1) and the lower and upper 90 % confidence limits becomes:

:///.doc

Confidential for Internal Use Only MTBF l =MTBF ⋅χ20. 05, 2⋅Q 2⋅Q f f +2 Print Date: 03/28/13 4:08 AM

MTBF u =MTBF ⋅χ20. 95, 2⋅Q f 2⋅Q f

Where Qf is the number of drives failed and MTBF is the value calculated per section 2 above. The chi-squared function is readily available in Excel as CHIINV(probability, deg. of freedom)

The error is very helpful in determining if fluctuations seen in MTBF are just noise or a real change in the quality of the drives. With the chosen 90 % confidence a good fit trend line should fall within the confidence limits 90 % of the time. If it doesn’t there is a high probability that there are real problems. An example of that is our own MTBF trend (attached below). For the spring of 2001 there are many data points that fall to the side of the trend line. We don’t know for sure what happened back then but it was the time when manufacture of the main boards was shifted from Flextronics in Sweden to Flextronics in Finland.

:///.doc

Confidential for Internal Use Only Print Date: 03/28/13 4:08 AM


相关文章

  • MTBF和MTTR在设备预防保全中的应用
  • 53 MTBF和MTTR在设备预防保全中的应用 梅清晨1,陆南耀2,张金梅1,王小强1,史广涛1 1.中航锂电(洛阳)有限公司:2.中国空空导弹研究院,河南 洛阳 471000 MTBF | MTTR | 预防保全 基于对设备预防保全和MT ...查看


  • 电子产品MTBF的意义及工程化计算方法
  • 电子产品MTBF的意义及工程化计算方法 冯敬东,来萍 (信息产业部电子第五研究所,广东 广州 510610) 摘要:对电子产品平均无故障工作时间(MTBF)的实际意义进行了深入的探讨,旨在使业界能正确理解这 一表征电子产品可靠性的常用概念: ...查看


  • WP78_R1_平均故障间隔时间_说明和标准
  • 平均故障间隔时间: 说明和标准 第78号白皮书 版本 1 作者 Wendy Torell 和 Victor Avelar 白皮书现收录于施耐德电气白皮书资料库 目录 点击内容即可跳转至具体章节 简介 2什么是故障?什么是假设? 2定义的可靠 ...查看


  • 数控车床的控制与维修
  • 摘 要 1952年,计算机技术应用到了机床上,在美国诞生了第一台数控机床.从此,传统机床产生了质的变化.近半个世纪以来,数控系统经历了两个阶段和六代的发展.数控技术的应用不但给传统制造业带来了革命性的变化,使制造业成为工业化的象征,而且随着 ...查看


  • 可靠性指标预计报告(TELCORDIA)V0
  • 可靠性指标预计报告 (Telcordia) 目 录 1 可靠性预计方法论 1.1 单元可靠性预计方法 1.2 器件故障率的预计方法 1.3 单模块故障率的计算方法 2 模块可靠性指标计算 2.1 单元可靠性指标预计 3 结论 4 附件 3 ...查看


  • 风机水泵变频节能计算
  • 风机水泵变频节能分析 一:原理 由流体传输设备水泵和风机的工作原理可知:水泵和风机的流量与其转速成正比:水泵和风机的压力(扬程)与其转速的平方成正比,而水泵和风机的轴功率等于流量与压力的乘积,故水泵和风机的轴功率与其转速的三次方成正比(即与 ...查看


  • 霍尔电流传感器工作原理及其应用
  • 霍尔电流传感器工作原理及其应用 [举报此文章] [推荐此文章] [ 2008-12-10 10:48:57 | By: 刘尧 ] 一.概述 伴随着城市人口和建设规模的扩大,各种用电设备的增多,用电量越来越大,城市的供电设 备经常超负荷运转, ...查看


  • TPM:设备故障信息收集.统计.分析基础及工具应用
  • 在故障管理工作中,不但要对每一项具体的设备故障进行分析,查明发生的原因和机理,采取预防措施,防止故障重复出现.同时,还必须对本系统.企业全部设备的故障基本状况.主要问题.发展趋势等有全面的了解,找出管理中的薄弱环节,并从本企业设备着眼,采取 ...查看


  • 关于设备管理的基本知识
  • 关于设备管理的基本知识 1.设备 设备一般指生产或生产上所常的机械和装置,是固定资产的主要组成部分,它是工业企业中可供长期,使用并在使用中基本保持原有实物形态的物质资料的总称. 在机械系统,设备通常指机械和动力两大类生产设施. 2.设备管理 ...查看


热门内容